Glossary entry (derived from question below)
Dutch term or phrase:
benuttingscoefficient
English translation:
utilisation factor, load factor, effectieve machine time coefficient, capacity usage ratio, capacity-to-usage ratio
Added to glossary by
Jack den Haan
May 12, 2009 07:34
15 yrs ago
Dutch term
benuttingscoefficient
Dutch to English
Tech/Engineering
Engineering (general)
context: de benuttingscoefficient wordt uitgedrukt in een percentage en is gelijk aan de verhouding tussen het aantal gerealiseerde uren voeding (van een machine) tijdens een referteperiode en het aantal mogelijke uren voeding (365 dgn x 24 u.)
Is er een Engelse term voor benuttingscoefficient?
Is er een Engelse term voor benuttingscoefficient?
Proposed translations
(English)
4 | utilisation factor, load factor | Jack den Haan |
3 +3 | capacity usage ratio | Bruce Gordon |
3 +1 | effective machine time coefficient | Chris Hopley |
Change log
May 14, 2009 16:48: Jack den Haan Created KOG entry
Proposed translations
27 mins
Selected
utilisation factor, load factor
Tip: try googling 'utilisation factor' or 'utilization factor' in combination with machine.
'Load factor' is often used in a very machine-technical sense, but according to 'Terminology in Logistics', published by the European Logistics Association, the term can also mean 'bezettingsfactor', which, I would say, is the same as 'benuttingsfactor'.
'Load factor' is often used in a very machine-technical sense, but according to 'Terminology in Logistics', published by the European Logistics Association, the term can also mean 'bezettingsfactor', which, I would say, is the same as 'benuttingsfactor'.
4 KudoZ points awarded for this answer.
Comment: "Hartelijk bedankt voor je antwoord. Utilization factor of utilization coefficient past het best in mijn vertaling."
+1
21 mins
effective machine time coefficient
I first thought of 'machine uptime', but then considered that 'effective machine time' is possible closer as the machine is not necessarily down when there is no feed.
-> "Improved method of determining the coefficient of effective machine time in textile operations in man-made fibre production"
http://www.springerlink.com/content/m6x7094769186153/
-> "Improved method of determining the coefficient of effective machine time in textile operations in man-made fibre production"
http://www.springerlink.com/content/m6x7094769186153/
Note from asker:
Prima antwoord. Dank je! |
+3
24 mins
capacity usage ratio
Another option to be considered, as an alternative to Chris's suggestion.
Note from asker:
Dank je voor je bijdrage. |
Peer comment(s):
agree |
Textpertise
: or capacity-to-usage ratio
1 min
|
agree |
Annabel Rautenbach
3 hrs
|
agree |
LouisV (X)
: capacity utilisation ratio I think would be better
15 hrs
|
Discussion